Electrical Safety Roundtable issues consumer guidance for plug-in solar devices

New advice sets out product checks, installation precautions and notification duties for plug-in solar buyers and users.

The Electrical Safety Roundtable (ESR) has launched new guidance aimed at helping consumers make informed and safe choices when buying, installing and using plug-in solar devices. The organisation said buyers need to consider more than simply purchasing a device from a supermarket, DIY store or online retailer.

The guidance explains the checks and precautions needed to help ensure that plug-in solar systems are compliant, suitable and correctly installed. Its stated aim is to encourage safety by setting out what consumers should look for and what steps they should take before and after installation.

Product and labelling checks

According to the ESR, a compliant plug-in solar device should meet the Plug-in Solar Device Interim Product Specification and be clearly marked and accompanied by a statement confirming compliance. Product labelling should identify the manufacturer, model or serial number, voltage, frequency, current, rated power, IP rating and protection class.

Consumers are advised to buy from reputable suppliers and to follow all instructions. The guidance also says users should never modify the plug, cables, inverter, panels, connectors or other supplied components.

Installation precautions

Ideally, the device should be connected to a nearby, suitably located and protected external socket-outlet. Cables must not be trapped in doors or windows, as this may damage them. Poorly routed and secured cabling can create trip hazards and further risk of damage, the guidance notes.

Before purchasing a plug-in solar device, the ESR strongly recommends that consumers find a qualified and competent electrician to perform the necessary checks on their electrical system. Consumers should also contact their insurer before buying a device.

People living in flats or apartments may need approval from the building owner, while tenants must seek permission from their landlord. Managing agents, planning authorities and other interested parties should be informed where applicable, according to the guidance.

Notification after installation

After installation, the Distribution Network Operator must be notified within 28 days. The instructions supplied with a compliant system should explain this process, the ESR said.

The guidance is intended as a resource for anyone supporting consumers who are considering plug-in solar. Letting agents and landlords can share it with tenants and residents to explain the permissions and safety checks that may be required.

Organisations can use it to raise awareness and signpost consumers to clear, consistent information. Electricians can also share it with potential customers to help them understand why checks by a qualified and competent electrician are important before installation.

Nick Hayler, Chair of the Electrical Safety in the Home group, said the group supports innovation that can help households embrace renewable energy and reduce their bills, but that it has to be done safely. Consumers should follow the guidance and use a competent and qualified person to help ensure their plug-in solar device is suitable and installed correctly, he said.

By making the guidance widely available, the ESR said it aims to help consumers benefit from plug-in solar while ensuring safety remains the priority.

EY

Emre Yildirim

Emre Yildirim is an editorial analyst covering electrical enclosures, junction boxes, cable glands, wiring devices, and cable management for industrial distribution and panel assembly. His articles apply IEC 60529 IP classification, product-specific NEMA type ratings, conductor and connector current ratings, and ingress-control checks to compare how enclosures and cable-entry components behave in real installations. He supports contractors, panel builders, and purchasing teams who must weigh fit, traceability, supplier documentation, lead time, and lifecycle cost before specifying or replacing a component.