Helix Construct enters administration owing £4.8m to suppliers

Newbury-based design-and-build contractor reports £4.8m supplier debt, £2.3m bank and financier debt and £260,000 in staff pay arrears.

Helix Construct, a Newbury-based design-and-build contractor, entered administration in September owing £4.8m to suppliers, according to an update filed at Companies House by administrator KR8 Advisory Limited.

The same update showed that the company owed £2.3m to its banks and financiers and £260,000 in outstanding pay to its 35 staff. Those figures set out the scale of the liabilities facing the business after it entered administration.

Helix's latest accounts pointed to growing pressure on cash and profitability. Auditors also raised concerns about the valuation and profit recognition on several contracts. For the 18 months to June 2025, turnover reached £40m, compared with £21m in the previous 12-month financial year. The comparison therefore spans an 18-month reporting period and a 12-month period.

The company had been in business since 2017, specialising in design-and-build construction for affordable housing, education, care and commercial projects across London and the south of England.

The disclosed debts cover obligations to suppliers, lenders and staff. The administrator's Companies House update provides the available detail on the company's financial position; the supplied information does not set out creditor recovery prospects or a timetable for the administration.

MS

Mireia Salcedo

Mireia Salcedo is an outdoor living analyst covering patio furniture, shade structures, residential fencing, pergolas, and fire pit layouts for global home and garden programs. She compares EN 581 scope where it applies, seat load and stability parameters, UV exposure under ASTM G154 methods, corrosion conditions, anchorage requirements, and packaging CBM against the intended market and test setup. Her work helps category buyers, outdoor furniture engineers, and importers set measurable acceptance criteria for weather resistance, safety, and seasonal logistics without treating supplier claims as certified results.